Liberal, KS

Now: 68 °

Currently: Clear

Hi: 68 ° | Lo: 45 °

U.S. 54 Mill and Overlay Begins at Six Points in Liberal

Joe Denoyer - August 20, 2018 11:33 am

Crews have begun a mill and overlay project on U.S. 54 in Seward County.  The project begins at the Six Points intersection in Liberal and continues east to the start of the four lane section on U.S. 54.  It will skip the four-lane concrete section east of Liberal and continue east from the end of the four lane section to the south city limits of Plains.

Traffic will be reduced to one lane controlled by flaggers and a pilot car.  KDOT urges drivers to be alert, pay attention to all work zone warning signs, and be prepared to stop.

APAC Shears of Hutchinson is the contractor on this $2.6 million project which is expected to be completed in September, weather permitting.

For more information on this project, contact Boyd Lear, Area Construction Engineer, at (620) 624-4451 or Lisa Knoll, KDOT District 6 Public Affairs Manager, at (620) 765-7080.

 

Latest Stories

Perryton Athletic Director Arrested for Sexual Assault of a Child

By Kristin Rodin PERRYTON, Texas (KFDA) – The Ochiltree County Sheriff’s Office says they have arrested...

City Passes Pet Registration Requirements

In an effort to address the rising population of stray and roaming animals, the City of...

Floyd Donates Aircraft to the Air Museum

Long time Liberal Agricultural Aviator, Jim Floyd, has donated his airplane, a 1971 Grumman Ag Cat,...

 
KSCB Radio News