Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Friday, 04 September 2015
Login |  Register 
***BREAKING NEWS***    Water Warning Issued For Satanta    ***
 
Find Products or Services in your local community
Friday
Low  69°
High 98°
Saturday
Low  70°
High 97°
Sunday
Low  69°
High 98°
Monday
Low  69°
High 96°
Tuesday
Low  63°
High 92°
Wednesday
Low  59°
High 85°
Thursday
Low  59°
High 85°
Current Temperature in Liberal KS is 98°  
KSCB Radio News US National Business Health & Science Political World Sports Top NPR Headlines Sports National Headlines
Resurfacing Projects Start in Morton, Grant, and Haskell Counties
04/29/2014

      The Kansas Department of Transportation expects resurfacing projects on K-27 and K-51 in Morton County to begin by Friday, May 2. The surface recycle projects run from Richfield, east to Rolla on K-51, and from Richfield, north to the Morton/Stanton County line on K-27.

            During construction, traffic will be limited to one lane through the work zone, guided by a pilot car. Drivers can expect delays of 15 minutes or less. The Kansas DOT urges drivers to be alert, pay attention to all work zone warning signs, slow down when approaching a work zone and be prepared to stop.

The contractor, Dustrol, Inc., of Towanda, plans to begin work on Friday at Richfield, working east and south on K-51 to Rolla. Once the K-51 portion is completed, the contractor will move to K-27. KDOT expects work on this $2.5 million T-WORKS preservation project to be completed by August, depending on weather.

 

            The Kansas Department of Transportation expects a resurfacing project on U.S. 160 in Grant and Haskell counties to begin by Wednesday, April 30. The project runs from Ulysses to the junction of U.S. 160, U.S. 83 and K-144. The work includes milling the top one inch of asphalt, followed by a two-inch asphalt overlay.

            The contractor, J & R Sand Co., Inc., of Liberal, plans to begin patching sections of U.S. 160 in Haskell County on Wednesday and then begin the mill and overlay operation in Grant County on Friday, May 2.

            During construction, traffic will be limited to one lane through the work zone, guided by a pilot car. Drivers can expect delays of 15 minutes or less. The Kansas DOT urges drivers to be alert, pay attention to all work zone warning signs, slow down when approaching a work zone and be prepared to stop.

KDOT expects work on this $3.5 million T-WORKS preservation project to be completed by the end of July, depending on weather.

      If you have questions on this project, you can call Greg Adams, Construction Engineer, at 620-624-4451 or Kirk Hutchinson, KDOT Southwest Public Affairs Manager, at 1-877-550-5368 (toll free).

You can stay aware of all road construction projects across Kansas at www.kandrive.org or by calling 5-1-1. To learn more about this and other T-WORKS projects, visit www.ksdot.org/tworks.

 

© KDOT
You will need to be logged in to leave a comment.
Please Login

characters left

The posting of advertisements, profanity, or personal attacks is prohibited.
Click here to review our Terms of Use.



MOST VIEWED STORIES
Ulysses Woman Charged With Murder, Child Abuse
Liberal Native Looks To Bring Pro Wrestling Back To Tulsa
Southwest Medical Center Announced the Addition of Two New Senior Leaders
Storage Unit In Liberal Contained Four Pounds Of Meth
Liberal's Kuhnel Tops Baseball America List
Garden City, Great Bend Named Finalists For Shipping Hub
SWMC Welcomes Dr. Van Trinh to SWPP Clinic
Dodge City Water Well Tests Positive For Chemicals
LHS Cross Country Eyes More Titles  
Judge In Texas Vacates Lesser Prarie Chicken Protection
Click Here For All Stories

LATEST STORIES
Water Warning Issued For Satanta
Friday's Games
Middle School Sports Results
Farmers Markets Shoppers Get Added Bonus
Liberal Blasts Great Bend in Opener
LHS Spikers Split in Garden City
Sarah Bayouth is Mead Lumber Athlete of the Week  
Game of the Week Schedule
Storage Unit In Liberal Contained Four Pounds Of Meth
SWMC Welcomes Dr. Van Trinh to SWPP Clinic
Click Here For All Stories
Click Here for KSCB Talk Radio 1270 am
Click Here for B107.5
Click Here for The Legend 102.7
click Here for ozzBlog
Click Here for the Emergency Alert Hanbook

©2015 Seward County Broadcasting Company, Inc.
1410 N. Western Ave. Liberal, KS 67901

Emergency Alert System | EEO Public Report Form | The Public and Broadcasting

Powered by Radio Media Group