Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Thursday, 18 September 2014
Login |  Register 
 
Find Products or Services in your local community
 
KSCB Radio News US National Business Health & Science Political World Sports Top NPR Headlines Sports
Famous Landmark At Risk With Highway Project
09/04/2013

It was an important landmark for western pioneers traveling on the Santa Fé Trail, the Point of Rocks at the Dodge City limits which now holds the city’s welcome sign.

It indicated to wagon trains that they were headed in the right direction, but a plan to widen Highway 50 between Dodge and Cimarron could mean its demise.

“Some of it was taken in a highway project in the 1980s, and that apparently leaves it free game to take the rest of it,” said Bill Bunyan, Dodge City’s chapter president of the Santa Fé Trail Association. ”And we do not think that’s right; we’d like to protect at least as much of it as possible.”

The most budget-friendly plan to make the 13 mile stretch of Highway 50 between Cimarron and Dodge City into a divided four-lane expressway involves following the highway’s current path, but there is no federal protection in place for the Point of Rocks, meaning it could be legally removed.

Kansas Department of Transportation engineers says they’re working to find the best route.

“What they’re trying to figure out is there a way to build the highway that we want to build and through that location without having to move the highway somewhere else or not build it at all,” said Kirk Hutchinson, KDOT.

Members of the Santa Fé Trail Association met with KDOT to voice their concerns and are hoping they can come to a compromise that will save the site.

“We’ve lived in western Kansas this long with nothing but a passing lane every 20 to 30 miles, and if the busiest part of the highway is between Cimarron and Dodge and there’s not a passing lane right now, looks to me like we can maintain a two lane for half a mile so that we can save a significant site,” said Mike Strodtman of the Santa Fé Trail Association.

KDOT says it’s still very early in the design process and it could still take up more than a year until the design is finalized.

© AP/KSN
You will need to be logged in to leave a comment.
Please Login

characters left

The posting of advertisements, profanity, or personal attacks is prohibited.
Click here to review our Terms of Use.



MOST VIEWED STORIES
Cimarron Man Injured In Vehicle Pursuit
Friday's Scores
Redskins Win Turnover Tussle in Guymon
Ogallala Aquifer To Be Discussed At Kansas State Fair
Kismet Fire Station To Be Discussed At Special Meeting
Oklahoma Releases A-F Report Cards For Schools
Oklahoma Says $1.5 Million Available in Drought Grants
Redskins Handle Great Bend in WAC Opener
Feds Allow Kansas To Withold Test Results
Friday's Games
Click Here For All Stories

LATEST STORIES
Kansas Highway System Ranked 5th in National Report
Officials Wait For Ruling In Senate Race
Stephanie Garcia is Mead Lumber Athlete of the Week  
Hutch Stymies Seward
Oklahoma Releases A-F Report Cards For Schools
Liberal Faces Two Ranked Teams in Home Quad
Red Demons Take Down Redskins in Overtime
Bob Dole To Visit Liberal, Surrounding Area
Feds Allow Kansas To Withold Test Results
Corn Harvest, Wheat Planting Underway
Click Here For All Stories
Click Here for KSCB Talk Radio 1270 am
Click Here for B107.5
Click Here for The Legend 102.7
click Here for ozzBlog
Click Here for the Emergency Alert Hanbook

©2014 Seward County Broadcasting Company, Inc.
1410 N. Western Ave. Liberal, KS 67901

Emergency Alert System | EEO Public Report Form | The Public and Broadcasting

Powered by Radio Media Group